Roadway Paving overview
Roads are built to shed water, not just to be flat
The single biggest difference between a road that lasts twenty years and one that fails in five is what happens to water. A properly built roadway is crowned or cross-sloped so runoff moves off the travelled surface into a ditch, swale or catch basin instead of soaking through the shoulder and undermining the base.
On long rural approaches and shared laneways in the Ottawa area, that usually means paying attention to the ditching and shoulders as much as to the asphalt itself. We look at where the water goes before we look at what the surface should be.
Built for repeated, heavier traffic
A shared laneway serving several households, a condo access road, or a farm approach takes trucks, deliveries and winter equipment. That means a deeper compacted granular base and an asphalt structure specified for the actual traffic, not for a passenger car.
We also pay attention to the edges. Unsupported asphalt edges on a road crumble under the first wheel that runs off the pavement, so shoulders get built up and compacted to support the edge rather than left to drop away.
What's included
- Assessment of existing drainage, ditching and shoulder condition
- Excavation or reclamation of the existing surface where required
- Deeper compacted granular base specified for the traffic the road carries
- Crown or cross-slope set so runoff leaves the travelled surface
- Hot-mix asphalt placed by paver and compacted to a consistent density
- Shoulder build-up and edge support so the pavement edge does not break down
- Traffic management that keeps access open for residents where possible
Start to Finish
What the Process Looks Like
No surprises. Here is exactly how a roadway paving project runs from the first phone call to the final walkthrough.
Site walk and measurement
We drive and walk the full length, note where water sits, check shoulder and ditch condition, and measure the actual area rather than estimating from a map.
Scope and access plan
You get a written scope and a plan for keeping access open — which sections close when, and how residents or tenants get in and out during the work.
Drainage and base correction
Soft spots, washouts and low areas are dug out and rebuilt. Ditching and shoulder grades are corrected where they are steering water into the base.
Base placement and compaction
Granular base is placed in lifts and compacted to depth, with the crown or cross-slope established before any asphalt goes down.
Paving
Hot mix is laid by paver in passes sized to the road width, with joints kept tight and rolled while the mat is still hot.
Shoulders and handover
Shoulders are built back up against the new edge, the site is cleaned, and we walk the finished road with you before handing it over.
Recent Work
Roadway Paving in Ottawa
Real Proseal Plus jobs, photographed on site. See more in the full project gallery.
Where We Work
Roadway Paving Across Ottawa
Our crews cover the entire city of Ottawa, ON and the surrounding area.
- Kanata
- Barrhaven
- Orleans
- Nepean
- Gloucester
- Stittsville
- Riverside South
- Manotick
- Greely
- Downtown Ottawa
Not sure if we reach your area? Get in touch — we are happy to check.
Common Questions
Roadway Paving FAQs
Do you pave private roads as well as city streets?
Our work is on private property — private roads, shared laneways, condo and commercial access roads, and long rural approaches. Municipal road contracts are tendered separately through the City.
Can residents still use the road while you work?
Usually yes, at least partially. On wider roads we work one lane at a time. On single-lane laneways there will be windows where the surface cannot be driven on, and we schedule and communicate those in advance so nobody gets blocked in.
Why does my laneway keep breaking up at the edges?
Almost always because the edge is unsupported. If the shoulder has eroded away or was never built up, the asphalt edge has nothing under it and the first wheel that runs off the pavement breaks it. The fix is rebuilding and compacting the shoulder against the new edge.
Do you handle the ditching too?
We assess drainage as part of every roadway job and correct grading and shoulder work that affects the pavement. Where major ditching or culvert work is needed, we will tell you during the estimate so it can be scoped properly rather than discovered halfway through.
How thick should a private road be?
It depends on the traffic it carries and the soil underneath. A laneway serving two households is a different build than an access road taking delivery trucks. We specify the base depth and asphalt structure after seeing the site and understanding what uses it.
Can a gravel road be converted to asphalt?
Yes, and it is common work for us. The existing gravel usually becomes part of the base, but it still needs to be graded, brought up to depth with additional granular, and properly compacted before paving — a gravel surface that has been driven on for years is not a base on its own.
Also From Proseal Plus
Related Services
Excavation & Grading
Everything that goes wrong with asphalt goes wrong underneath it.
Learn moreDriveway Paving
A driveway is the first thing anyone sees and the last thing anyone thinks about until it fails.
Learn moreHot Asphalt Repair
Potholes, cracks and broken edges are cheap to fix and expensive to ignore.
Learn moreReady When You Are
Get a Free Roadway Paving Estimate
Tell us about your project and we'll book a free, no-obligation on-site visit anywhere in Ottawa.